Bondi Junction - Sydney
Project Size:115 Stairs - (10 flights + landings)
Project Brief:The strata manager for an apartment building contacted us, as they had a safety issue with the staircase. It had previously been painted numerous times with low quality paint, without adequate preparation. The surface of the stairs was slippery, and with the layers of paint showing through was an unsightly entrance to the building.
They were looking for something that would stand the test of time, and give the entrance of the building a fresh new look.
- Existing coating needed to be removed back to bare concrete to ensure adequate adhesion of new epoxy system.
- Needed to be able to sustain high traffic.
- Couldn’t be slippery.
Our onsite team meticulously prepared the stairs using hand held diamond grinding equipment coupled with our HEPA dust extractors to ensure all coating was removed,
and there was no dust risk to the residents of the building.
Using our multicoat flake system we were able to ensure a long lasting floor coating that incorporated anti slip top coats.
To finish it off, our team installed Australian standard compliant stair nosing to all stairs.